What arrives in your kit

How to check panels, labels, timber packs, membranes, and extras before the install starts.

Approx 7 min0 / 9 lessons complete0% progress

Kit contents

A kit may include labelled SIP panels, cut pieces, splines, membranes, roof coverings, and optional timber or installation items depending on the quote.

Timber packs are supplied as material packs unless your paperwork clearly says otherwise. They should be checked before cutting on site.

First checks

Before panels are moved into position, check the delivery against the order documents and panel schedule. Report missing or damaged items as soon as possible.

Keep labels visible until the panel is fitted. The labels are there to make the sequence and location easier to follow.

Before you move on

  • OKCheck quantities against the order paperwork
  • OKPhotograph any delivery damage before moving panels
  • OKStore membranes, fixings, and small parts together