Stock SIP panels: 5-10 working days
<- Back to SIP University

Details That Matter

Splines, fixings, and glue lines

How panel joints are made and what to check before they are closed up.

Approx 8 min0 / 9 lessons complete0% progress

Joint quality

Splines and glue lines help panels act together. A dry, missing, or poorly fitted joint can lead to movement, gaps, and reduced performance.

Make sure joint faces are clean, dry, and aligned before adhesive is applied.

Fixing checks

Fixing type, spacing, and edge distances should follow the project details. Do not substitute fixings without checking first.

If a panel has been damaged near a joint, photograph it and ask for guidance before installing.

Before you move on

  • OKCheck joint faces before adhesive
  • OKUse the specified fixing type
  • OKRecord and report damaged joint edges