Standard Details (SD)

SD-27: Standard Window Cill Connection

Cill build-up with DPC continuity and cavity detailing.

Duration: 8 minLevel: Details
SD-27: Standard Window Cill Connection

SD-27: Standard Window Cill Connection

What this detail covers

  • A typical window cill build-up and finish strategy.
  • Ensuring DPC continuity under the cill and across the cavity.

Key steps

  1. Confirm the cill type (fabricated to suit cavity) and the required cavity width.
  2. Install DPC continuously under cills and across the cavity as shown.
  3. Maintain breather membrane continuity and install cavity fire stop material as specified.

Checks

  • DPC is continuous and correctly lapped/drained.
  • Cill supports and fixings do not puncture critical moisture layers without the specified detailing.

Common mistakes

  • DPC discontinuity at cill ends leading to moisture ingress.
  • Insufficient cavity clearance/drainage path.

Indicative only: always follow the engineer’s fixing schedule and the project drawings.

Ready to build your own kit specific to your project?

Explore SIP kit options and choose the build type that fits your brief.

View kit options

Finished this lesson?

Mark it as complete to track your progress towards becoming a SIP expert.