What this detail covers
- The roof-to-wall connection at the eaves.
- Where rafter extensions may be required (by others) for overhang/finish detailing.
Key steps
- Confirm eaves geometry, overhang, and external finish requirements.
- Apply PU adhesive at the shown interfaces and seat the roof panel correctly.
- Fix to specification (subject to final engineering approval).
Checks
- Eaves line is straight and the roof seat is consistent along the wall.
- Adhesive lines are continuous and not interrupted by debris/moisture.
Common mistakes
- Inconsistent roof seat leading to wavy fascia/soffit lines.
- Forgetting to coordinate rafter extensions/overhang early.
Indicative only: always follow the engineer’s fixing schedule and the project drawings.