What this detail covers

  • An example floor arrangement where joists run parallel to a timber ring beam.
  • Where blocking is used to support deck edges and maintain stiffness.

Key steps

  1. Confirm ring beam build-up and joist direction from the engineered floor drawings.
  2. Install ring beams/blocking as shown and fix to schedule.
  3. Fit deck, keeping edges supported and aligned to the layout.

Checks

  • Ring beam line is straight and fixed to spec.
  • Deck bearing/support is continuous where required.

Common mistakes

  • Leaving deck edges unsupported at the perimeter.
  • Blocking locations that clash with service routes.

Indicative only: always follow the engineer’s fixing schedule and the project drawings.

Ready to build your own kit specific to your project?

Explore SIP kit options and choose the build type that fits your brief.

View kit options

Finished this lesson?

Mark it as complete to track your progress towards becoming a SIP expert.