What this detail covers

  • Using a solid timber post/spline to connect two SIP panels.
  • Where built-up (2‑ply) splines are permitted, adhesive is mandatory.

Key steps

  1. Confirm the specified spline type (single solid timber or 2‑ply built-up).
  2. Apply a continuous bead of PU adhesive to mating faces before assembly.
  3. Install fixings as per the nailing/fixing schedule to clamp and align the joint.

Checks

  • Spline is fully seated and aligned before final fixing.
  • Adhesive line is continuous (no dry gaps).
  • Joint faces are flush to accept internal linings/external layers.

Common mistakes

  • Missing adhesive on built-up sections (weak + leaky joint).
  • Fixings too close to panel edges causing breakout.

Indicative only: always follow the engineer’s fixing schedule and the project drawings.

Ready to build your own kit specific to your project?

Explore SIP kit options and choose the build type that fits your brief.

View kit options

Finished this lesson?

Mark it as complete to track your progress towards becoming a SIP expert.